What the Index measures
The Synertia NEM BESS Capture Index measures how much of their LP-optimal revenue ceiling each grid-scale battery in the National Electricity Market is actually capturing. The metric is expressed as a capture rate — actual revenue divided by LP-optimal revenue — published monthly per DUID (Dispatchable Unit Identifier).
A capture rate of 85% means the asset earned 85 cents of every dollar the LP model shows was theoretically available at its connection point, with its rated capacity and SoC constraints, given the 5-minute prices that actually occurred. The remaining 15% is the gap, which the Index decomposes into three independently quantifiable sources.
Coverage and scope
The Index covers all commissioned NEM BESS DUIDs across SA1, VIC1, NSW1, QLD1, and TAS1. The current fleet comprises approximately 60 DUIDs operated by 30+ operators, ranging from 30 MW / 30 MWh peakers to multi-hundred-MW systems exceeding 4-hour duration.
Coverage is updated each quarter as new assets commission. Assets are added on the first full calendar month following their AEMO registration date. Decommissioned or mothballed units are retained in history.
LP-optimal benchmark
For each DUID, we solve a linear programme over the AEMO DISPATCHPRICE time series for the asset's region. The LP maximises revenue subject to physical and regulatory constraints:
Parameters
- P_max — registered MW capacity from AEMO NEM Registration and Exemption List
- E_cap — rated energy capacity (MWh) from AEMO records; duration assumptions applied where not published
- SoC_min / SoC_max — 10% / 90% of E_cap (conservative bounds to exclude technical cell limits)
- MLF — Marginal Loss Factor for the asset's connection point and financial year, sourced from the AEMO MLF publication
- Δt — 5 minutes (1/12 hour)
- RR_max — P_max × 2 per interval (non-binding in practice for most dispatch profiles)
The LP is solved at daily resolution over a rolling window. The benchmark is the energy-only LP revenue ceiling — FCAS market revenue is tracked separately and excluded from the capture rate numerator and denominator to avoid double-counting and to isolate the dispatch execution gap.
SCADA actuals
Actual dispatch is sourced from AEMO DISPATCHSCADA at 5-minute resolution. Each DUID's MW output is recorded in AEMO's production dispatch data tables.
Actual revenue for each 5-minute interval is computed as:
Where DISPATCHPRICE is the regional reference node price for the asset's region. The MLF applied is the same value used in the LP benchmark, ensuring the two are directly comparable at the connection-point level.
Data completeness
DISPATCHSCADA has occasional data gaps (typically under 0.3% of 5-minute intervals per month). Where a DUID has more than 2% missing intervals in a given month, that month is flagged with a data quality warning in the Index. Gaps under 2% are interpolated linearly within the same trading day.
For assets commissioned during a month, only the intervals from their market start date are included. This prevents zero-dispatch pre-commission intervals from artificially depressing capture rates.
Capture rate calculation
The monthly capture rate for a DUID is:
The operator-level capture rate is the revenue-weighted average of all DUIDs the operator controls in a given month. This correctly weights larger, higher-revenue assets more heavily than smaller ones.
Gap attribution framework
The gap between LP-optimal and actual revenue is decomposed into three mutually exclusive and exhaustive components using counterfactual simulation. Each component is computed by varying one factor while holding others constant.
| Code | Name | Definition | Typical range |
|---|---|---|---|
| G-SIG | Signal gap | Revenue foregone because the asset did not receive, or did not act on, a HIGH advisory signal on a genuine high-price event day | 15–40% of gap |
| G-THR | Threshold gap | Revenue foregone because the asset discharged during a recognised event, but at the wrong SoC floor or price threshold — releasing energy below the day's peak price window | 25–50% of gap |
| G-PRO | Profile gap | Revenue foregone due to intra-window execution profile differences — charge timing, ramp behaviour, and FCAS co-optimisation decisions that affect within-window MW delivery | 20–45% of gap |
The attribution is computed per event day. An event day is any trading day where the LP-optimal revenue in the asset's region exceeded a revenue threshold calibrated to the asset's capacity (currently: revenue per MWh of rated capacity in the top 10th percentile of historical event days).
G-SIG: Signal gap
G-SIG measures the revenue available on days where Synertia's three-thread signal system would have issued a HIGH advisory, but the asset's actual dispatch profile suggests no elevated dispatch strategy was active.
Operationally: on a HIGH advisory day, an optimally positioned asset should enter the primary dispatch window with SoC at or above the advisory target. G-SIG captures the event days where this did not happen — either because no advisory was issued (a signal miss), or the advisory was issued but not acted upon.
G-SIG is therefore bounded by the advisory system's recall rate: on days where the signal system issues a FALSE HIGH (high advisory, no event), G-SIG is zero for that day. The signal false-positive cost is tracked separately.
G-THR: Threshold gap
G-THR measures revenue foregone because the asset discharged at the wrong time within a high-price day — specifically, because its effective price floor was set too low relative to the day's actual peak window.
This gap is computed via counterfactual simulation: we solve the LP with a modified price series in which all prices below the asset's effective dispatch threshold (inferred from its SCADA profile) are set to zero, and compare the resulting revenue to the full-price LP. The gap is G-THR.
A large G-THR indicates the asset was discharging during mid-priced intervals while the highest-priced intervals occurred later — a common pattern on days where the evening peak arrives later than the charging window anticipated.
G-PRO: Profile gap
G-PRO is the residual gap after G-SIG and G-THR are subtracted from the total gap. It captures execution differences within an event window where the asset was active and at the right price level, but the MW delivery profile differed from LP-optimal.
Sources of G-PRO include:
- FCAS co-optimisation obligations reducing available energy dispatch headroom
- Conservative ramp constraints or battery management system limits below asset registration parameters
- Intra-window SoC depletion earlier than optimal, leaving the asset unable to discharge in the final (often highest) intervals
- Manual operator interventions that override automated dispatch
G-PRO is the most operationally complex component to close — it often requires EMS-level integration or FCAS co-optimisation model changes rather than advisory improvements alone.
Three-thread signal architecture
Synertia's advisory signal system uses three independent threads, each sourced from a different data domain. A HIGH advisory requires a conjunction of signals across threads, calibrated to the region's historical event base rate.
Wind drought detection and renewable supply pressure scoring using digital twin generation models and WeatherNext 3 NWP forecasts. T1 is the event gate — the primary discriminator between event and non-event days.
Demand z-score relative to seasonal baseline, using AEMO DEMANDOPERATIONALFORECAST and a gradient-boosting model trained on temperature, humidity, and calendar features. T2 is the event amplifier.
Interconnector binding probability from a logistic regression classifier trained on 6 years of IC flow, constraint set activity, and renewable generation features. T3 provides price amplification context.
Signal logic
The HIGH advisory tier is issued when the following region-specific conditions are met:
- SA1 / VIC1: T1-Extreme or (T1 and (T2 or T3))
- NSW1 / QLD1: T2 or T3 (supply pressure is less discriminating in these regions)
- TAS1: signal suppressed — hydro-dominated supply dynamics require a separate hydro storage model
Backtest performance (as at October 2026)
Post-DS-A4 and FP-INV-1 audit extension, using revenue-positive event labels:
- SA1: F1 = 0.236 · Macro F1 (excl. TAS1) = 0.241
- VIC1: F1 = 0.264 (IC binding revenue classifier at threshold 0.35; 22 events, 7 TP, 24 FP, 15 FN)
- NSW1: F1 = 0.271
- QLD1: F1 = 0.190
These metrics reflect the genuine difficulty of predicting NEM high-price events 24+ hours ahead. The signal system is designed to trade false-positive cost (unnecessary cycle degradation) against false-negative cost (missed revenue opportunity) at calibrated operating points.
WeatherNext 3 integration
From October 2026, Synertia's T1 supply pressure signal uses Google DeepMind's WeatherNext 3 (WN3) numerical weather prediction model as its primary meteorological data source, with ERA5 reanalysis as fallback.
WN3 provides ensemble wind speed and solar irradiance forecasts at 0.25° spatial resolution and 6-hourly temporal resolution, with ensemble spread used as a drought confidence signal. Key advantages over ERA5 for near-real-time advisory use:
- Initialised from operational analysis with sub-12-hour latency (ERA5 has 5-day latency)
- Ensemble members provide uncertainty quantification absent from ERA5 deterministic fields
- Global coverage allows IC-coupled wind event detection across SA–VIC–NSW corridors
Data sources
| Source | Table / File | Use |
|---|---|---|
| AEMO NEMWEB | DISPATCHPRICE | 5-minute regional reference node prices for LP and actual revenue computation |
| AEMO NEMWEB | DISPATCHSCADA | 5-minute DUID-level MW dispatch actuals |
| AEMO NEMWEB | DISPATCHLOAD | Interconnector flow and constraint binding, used in T3 IC binding model |
| AEMO | NEM Registration and Exemption List |
DUID capacity (MW), registered fuel type, commissioning dates |
| AEMO | MLF Publication (annual) | Marginal Loss Factors per DUID and financial year |
| AEMO NEMWEB | DEMANDOPERATIONALFORECAST | D+1 operational demand forecast used in T2 demand signal |
| Google DeepMind | WeatherNext 3 (WN3) | Ensemble NWP forecasts for T1 supply pressure signal (wind speed, solar irradiance) |
| ECMWF ERA5 | ERA5 reanalysis | Historical wind and temperature data for model training; fallback when WN3 unavailable |
All AEMO NEMWEB data is public and available from nemweb.com.au. Synertia does not modify or restate raw AEMO data; all computations are applied to the source data as published.
Pre-publication audit
Before any Index figures are published or released to registered users, the monthly data release passes an automated pre-publication audit. AUDIT_PASS is required; a failing audit blocks publication until the issue is resolved.
Audit checks
- LP accuracy check: The LP solver is run against a held-out validation set of known-event days. LP revenue must recover within 2% of the reference benchmark on all validation days.
- SCADA completeness: Each active DUID must have ≥ 98% of 5-minute intervals populated. DUIDs below this threshold are excluded and flagged in the release notes.
- MLF consistency: The MLF table used in computation must match the AEMO-published MLF for the financial year. Any divergence blocks publication.
- Methodology consistency: All formula parameters (SoC bounds, terminal constraint, interval duration) are verified against the canonical parameter set. Any parameter drift — which could indicate a code regression — triggers a review.
- Capture rate plausibility: Capture rates above 110% for any DUID trigger a manual data quality review before publication.
- Attribution completeness: G-SIG + G-THR + G-PRO must sum to within 0.5% of total gap for every DUID. Any residual above this indicates an attribution model error.
Limitations and important caveats
Not investment or trading advice. The Capture Index is an analytical benchmark, not a recommendation to trade, invest, or alter dispatch strategy. Revenue figures represent what was theoretically achievable with perfect hindsight — not a guarantee of future performance or a realistic trading target.
Known model limitations
- FCAS co-optimisation: The LP benchmark optimises energy dispatch only. An asset with significant FCAS obligations faces a co-optimisation constraint the energy-only LP does not model. G-PRO will include this effect, but it cannot be further decomposed without access to the operator's FCAS bid data.
- Intra-dispatch period dynamics: The NEM clears at 5-minute resolution but some pricing dynamics occur within the dispatch interval (rebidding, fast-frequency response). The LP and SCADA are both at 5-minute resolution and will miss intra-interval revenue opportunities and obligations.
- Duration assumptions: For DUIDs where AEMO has not published rated energy capacity, a duration assumption is applied (typically 2 hours for assets registered as BESS). If the actual installed capacity differs from the registered capacity, the LP benchmark will be computed against the registered figure.
- Terminal SoC constraint: The terminal constraint (SoC[T] ≥ SoC[0]) prevents the LP from extracting net energy from the asset over the optimisation window. In practice this is solved daily, so the LP is effectively constrained to be SoC-neutral per day. An asset that runs a multi-day SoC strategy may have a different optimal profile than the daily LP.
- Market power effects: The LP is a price-taker model. Large BESS assets can influence regional spot prices through their dispatch volume. The LP does not account for this — for dominant assets in constrained regions, the benchmark may overstate achievable revenue.
What the Index does not measure
- FCAS market revenue (tracked separately, excluded from capture rate)
- System services, ancillary services, or bilateral contract revenue
- Merchant hedging or financial settlement positions
- Negative price events where non-dispatch may be financially optimal